NetSuite Reference
Manufacturing
Supply chainBills of material and their dated revisions, the component lines underneath them, routings and their operation steps, the cost templates a step is costed with, and the operation tasks a running order is executed through. Work orders stay on the transaction spine and are reached through the record map.
8 tables
Analytics Browser 2021.1 · corroborated 2025.2 · Verified August 2026
Tables
Master · 7
- bomThe bill-of-materials header: one row per BOM, naming it and setting which assemblies, locations and subsidiaries it may be used on. The component lines live on the revision, not here.master
- bomrevisionA dated version of a bill of materials: one row per revision, with the effective start and end dates that decide which component list is in force on a given day.master
- bomrevisioncomponentThe BOM line: one row per component on a revision, with the quantity, the BOM quantity, the component yield, the unit and how the component is sourced.master
- manufacturingcosttemplateThe manufacturing cost template: a named set of labor, machine and overhead rates a routing step is costed with, owned by a subsidiary.master
- manufacturingcosttemplatecostdetailThe rate lines of a cost template: one row per cost category, with the charge item, the run rate and the fixed rate that category contributes.master
- manufacturingroutingThe routing header: one row per routing for an item, tied to the bill of materials it is run against, with a default marker and the subsidiary that owns it.master
- manufacturingroutingroutingstepThe operation steps of a routing: one row per step, with its sequence, name, work center, cost template, run rate per unit and setup time.master