NetSuite Reference
Planning
Supply chainThe planning parameters at item and location — reorder point, safety stock, lead times, time fences and lot sizing — plus the demand plans and their time buckets, and the supply plans with the orders and action messages the engine produced.
6 tables
Analytics Browser 2021.1 · corroborated 2025.2 · Verified August 2026
In the business-problem map Demand Planning & Forecasting
Tables
Transaction · 5
- itemdemandplanThe demand plan header: one row per item and location being planned, with the projection method, interval, duration and start date that define the plan's time buckets.transaction
- itemdemandplandemandplandetailThe demand plan's time buckets: one row per bucket, with its row number, start and end dates and the planned quantity.transaction
- itemsupplyplanThe supply plan header: one row per item and location the planning engine produced supply for, with the unit of measure the plan is stated in.transaction
- itemsupplyplanorderThe planned orders a supply plan generated: one row per proposed order, with its type, order and receipt dates, quantity, source location and whether it has been turned into a real document yet.transaction
- itemsupplyplanplanningmessageThe planning engine's action messages: one row per recommendation — reschedule in, reschedule out, cancel — with the message text, the quantity, the dates involved and the order it refers to.transaction