JDE Reference
30Product Data Management
Supply chainBills of material, routings, and product costing that define how items are built
3 tables3 programs
Verified September 2026
Tables
Master Data · 3
- F30006One row per work center within a branch/plant, holding the capacity, efficiency, crew, and shift-hour attributes used by scheduling, capacity planning, and cost rollups.master
- F3002One row per component line on a parent item's bill of material at a branch/plant, effective-dated, holding the quantity-per and usage rules that drive BOM explosion and product costing.master
- F3003One row per operation step in an item's routing at a branch/plant, effective-dated, carrying the work center, time standards, and yield percentages that drive scheduling and labor costing.master
Programs
- P3002Bill of Material Revisions — the screen where engineering builds and maintains bills of material: components, quantities per, effectivity dates, and substitutes.Interactive
- P3003Enter/Change Routing — the screen where manufacturing engineering defines the standard routing for an item: operations, work centers, and labor/machine time standards.Interactive
- P3006Work Center Revision — the screen for defining work centers and their rates, crew sizes, capacity, and dispatch details used by routings and costing.Interactive